5TP HDD1 Project in Thailand



- - HDD Brief Information: 1400m /42 inch/ Steel Pipe/ Gravel, sand and Rock Stratum
- - Project Information: Rayong Gulf area, 5TP Project in Thailand
- HDD Rig: GD-6000L, The maximum pullback force is 600 tons
- Con. Duration:2018/10/15- 2019/02/18, total 95 days
- Owner: PTT , Contractor: SINOPEC